Financing the AI buildout
How is the AI infrastructure buildout being financed, and where does the financial risk sit?
Edited by Finquill Research · Updated Oct 21, 2026
Review cadence: Weekly review; re-checked on named earnings and filing dates. Not daily.
Reviewed by the editor · Analytics, not advice
Free account. See what changed since your last visit, and the dates to watch on your calendar. Following never means agreeing.
Short answer (filings to 21 Oct 2026). Taken together, the biggest spenders now invest slightly more than their operating cash in AI data centres. The cash gap is at Amazon and Oracle; Microsoft, Meta and Alphabet still covered capex from operating cash in their latest filed periods. Across all of them, the buildout is increasingly carried by bonds, new equity and, above all, long-dated leases and guarantees that sit outside reported debt. Fixed obligations are spreading outward. Hyperscalers hold large commitments that are not yet on their balance sheets. Bond and venture investors hold data-centre asset risk. The most leveraged layer, CoreWeave, holds refinancing and customer-concentration risk.
What changed in this update
The first update, published Oct 21, 2026.
What's next
Dated tests · reviewed by the editor
Nov 13, 2026 · META
Meta's Q3 2026 Form 10-Q reports leases not yet commenced above $278.99bn.
Nov 13, 2026 · MSFT
Microsoft's Form 10-Q for the quarter to 30 Sep 2026 shows no proceeds from issuance of debt.
Nov 30, 2026 · CRWV
CoreWeave's Q3 2026 Form 10-Q shows total debt above $40bn.
Open questions
- Meta Q3 2026 (results 21 Oct; 10-Q expected by about 30 Oct): do leases not yet commenced rise above $278.99bn, does the Louisiana venture's $46.03bn maximum loss exposure change, and does capex again exceed operating cash flow?
- Microsoft FY27 Q1 (28 Oct): does the cash flow statement again show no proceeds from debt issuance while finance lease liabilities keep growing?
- Amazon Q3 (29 Oct) and Alphabet Q3 (expected late Oct, date unconfirmed): does capex still exceed operating cash flow, how far do Amazon's $137.2bn of leases not yet commenced move, and does Alphabet's $43.8bn of data-centre backstops grow after its $25bn August bond?
- CoreWeave Q3 2026 (expected around 12 Nov, date not yet announced): does total debt pass $40bn after the August loan and September convertibles, does interest keep rising as a share of revenue, and does the largest customer's share stay near 36%?
- Federal Reserve Financial Stability Report (November, date to be announced): does debt-funded AI capex move up the list of risks that survey respondents cite?
- Oracle Q2 FY27 (mid-December, estimated): do notes payable and other borrowings rise above $125.3bn, and does capex still exceed operating cash flow once customer prepayments are excluded?
The analysis
Spending against cash, and debt
- In H1 2026 Meta ($49.1bn), Alphabet ($80.6bn) and Amazon ($96.3bn) spent about $226bn on property and equipment against about $220bn of operating cash flow (derived from their Q2 10-Qs; each company's own capex definition).
- Their non-current long-term debt rose from $170.9bn at 31 Dec 2025 to $310.7bn at 30 Jun 2026, up about 82% (derived from balance sheets; carrying values).
- Issuance continued after June: Alphabet closed $25bn of US dollar notes on 10 Aug (maturities out to 2066) and Amazon £4.25bn of sterling notes on 14 Sep.
Obligations outside reported debt
- Leases signed but not yet commenced (undiscounted, not on the balance sheet): Microsoft $329.1bn, Oracle $288bn (31 Aug), Meta $278.99bn, Amazon $137.2bn, Alphabet $85.2bn. Together about $1.12tn, roughly 2.4 times the five companies' combined non-current long-term debt of about $460bn (derived; different dates and definitions). Meta signed about $68bn more in July.
- Meta's unconsolidated Louisiana data-centre venture carries a maximum loss exposure of $46.03bn, including residual value guarantees with a threshold of about $28bn. A planned El Paso venture would add guarantees of up to about $13bn.
- Alphabet backstops data-centre payment obligations through credit derivatives with a $43.8bn notional at 30 June, up from $16.9bn at year-end, and has agreed to provide an estimated $24.1bn more.
Microsoft and Oracle: two routes
- Microsoft raised no debt in fiscal 2026 (year to 30 June). Its $115.9bn of capex was covered by $182.9bn of operating cash flow, while total finance lease liabilities rose to $66.6bn from $46.2bn. Its added capacity is being contracted through leases rather than bonds.
- In the quarter to 31 Aug, Oracle's capex of $28.5bn exceeded operating cash flow of $23.1bn, which itself included $11.4bn of customer prepayments. Oracle raised $19.9bn of equity through an at-the-market programme. Notes payable and other borrowings were about $125.3bn, down from about $129.5bn at 31 May (derived).
Equity and vendor financing
- Alphabet raised about $49.5bn of equity in June: a $20.5bn share offering, a $10.0bn private placement with a Berkshire Hathaway affiliate and $19.0bn of mandatory convertible preferred stock.
- Money also flows from suppliers to customers. Amazon invested $28.7bn in OpenAI preferred stock in H1, funded a further $21.3bn after June and put $10.0bn into Anthropic. Alphabet has a $20.0bn contingent funding commitment to an unnamed private company.
CoreWeave: the leveraged layer
- Total debt was about $35.1bn at 30 June, up from about $21.4bn at year-end (derived; net carrying amounts). Q2 net interest expense of $640m was about 25% of $2,575m revenue (derived).
- One unnamed customer accounted for 36% of Q2 revenue and another for 26%; together they held 64% of receivables (derived). Contracted backlog (RPO) was $103.7bn.
- Since June it has added a $2.6bn delayed-draw loan at SOFR plus 5.50%, taken out to finance GPU servers for customer contracts, and $4.2bn of 2.875% convertible notes due 2033.
Official sector
- The IMF (13 Oct) counted about $650bn of debt and $300bn of equity across 14 AI transactions since 2023, against $1.4tn of future revenue commitments. It said circular financing could weaken the value of that debt if key recipients come under stress.
- In the Fed's May survey of market contacts, respondents cited capex "increasingly funded by debt, creating leverage in the system".
Where the risk sits, on current evidence
- Hyperscalers carry the largest exposure by size, mostly as long-dated lease commitments, residual value guarantees and backstops rather than bonds. Their cash flow is large: in the latest filed periods it covered capex at Microsoft, Meta and Alphabet, but not at Amazon or Oracle (derived).
- Bond, venture and private-credit investors fund data-centre assets whose value depends on tenants renewing. Guarantees shift part of that risk back to the hyperscaler.
- Neoclouds carry the highest leverage and interest burden. CoreWeave depends on a handful of customers, so stress at one large AI customer would show up there first.
- The tightest link is the small group of AI labs that sit behind backlogs, vendor investments and backstops at the same time. This is the IMF's circular-financing point.
Strongest alternative
The core borrowers are among the most cash-generative companies in the world, and their financing mix is more conservative than headline debt growth suggests. Microsoft covered $115.9bn of fiscal 2026 capex from $182.9bn of operating cash flow without issuing debt. Alphabet paired its bond issuance with about $49.5bn of new equity. Oracle raised $19.9bn of equity while its borrowings fell in the quarter.
Lease and backlog figures are two-sided. Commitments not yet commenced are matched by contracted revenue: remaining performance obligations of $684bn at Microsoft, $664bn at Oracle, $519.5bn at Alphabet and $103.7bn at CoreWeave. Leases not yet commenced start only when the capacity is handed over. Even CoreWeave's delayed-draw loans are collateralized by contracted cash flows that its filing describes as generally from investment-grade counterparties.
On this reading, debt is a cheap, term-matched funding choice by highly rated issuers. Material risk is concentrated in a narrow set of leveraged intermediaries (neoclouds, SPV lessors and their bondholders) and a few large AI customers, not in hyperscaler balance sheets.
Developments
Oct 13, 2026
IMF flags AI leverage and circular financing in its October GFSR
The IMF's October Global Financial Stability Report, summarized on its blog, counted about $300bn of equity and $650bn of debt across 14 AI transactions since 2023, against $1.4tn of future revenue commitments. It noted that hyperscalers are borrowing more and warned that circular financing could weaken the value of the accumulated debt.
The official sector now names debt-funded AI investment as a financial-stability channel, alongside the Fed's May survey.
2 reports · one development
Reports sharing an origin are coverage, not independent confirmation.
Sep 22, 2026
CoreWeave adds a $2.6bn GPU-financing loan and $4.2bn of convertibles
On 7 Aug a CoreWeave subsidiary signed a $2.6bn delayed-draw term loan at Term SOFR plus 5.50%, maturing in 2031, to finance GPU servers for customer contracts; it is secured on the borrower's assets and guaranteed by the parent. On 22 Sep CoreWeave completed $4.2bn of 2.875% unsecured convertible notes due 2033.
Raises debt at the most leveraged company in scope ahead of its Q3 10-Q, the test for the CoreWeave watch-claim.
2 reports · one development
Reports sharing an origin are coverage, not independent confirmation.
Sep 14, 2026
Amazon closes £4.25bn of sterling notes
Amazon closed four sterling tranches totalling £4.25bn of principal (5.200% due 2029 to 6.650% due 2045), with a £4.242bn offering price.
Extends Amazon's multi-currency borrowing after its non-current long-term debt nearly doubled in H1 2026.
1 report · one development
Reports sharing an origin are coverage, not independent confirmation.
Sep 11, 2026
Oracle's quarter: capex above cash flow, $19.9bn of equity, $288bn of leases to come
Oracle's 10-Q for the quarter to 31 Aug showed $28.5bn of capex against $23.1bn of operating cash flow, which included $11.4bn of customer prepayments. It raised $19.9bn of equity through an at-the-market programme and reported $288bn of lease commitments not yet commenced; borrowings were about $125.3bn.
Shows a hyperscaler funding capex with customer prepayments and equity as well as debt, and adds a third large block of leases not yet on the balance sheet.
1 report · one development
Reports sharing an origin are coverage, not independent confirmation.
Aug 10, 2026
Alphabet closes $25bn of US dollar senior notes
Alphabet closed a $25bn public offering of US dollar notes in ten tranches, from floating-rate notes due 2028 to 6.500% notes due 2066. It follows $51.8bn of notes issued in H1 2026 across six currencies.
Adds to the H1 debt rise behind the explanation; the Q3 10-Q will show Alphabet's debt after the issue.
1 report · one development
Reports sharing an origin are coverage, not independent confirmation.
Evidence
Sources: Meta Platforms, Inc. (SEC Form 10-Q, Q2 2026) ×3 · Alphabet Inc. (SEC Form 10-Q, Q2 2026) ×3 · CoreWeave, Inc. (SEC Form 10-Q, Q2 2026) ×3 · Amazon.com, Inc. (SEC Form 10-Q, Q2 2026) ×2 · International Monetary Fund (IMF Blog, Global Financial Stability Report October 2026) ×2 · Microsoft Corporation (SEC Form 10-K, fiscal year ended 30 June 2026) · and 6 more
Meta Platforms, Inc. (SEC Form 10-Q, Q2 2026) · Jul 29, 2026
Open the sourceIn addition to the lease liabilities that are included on our balance sheet, we have operating and finance leases that have not yet commenced as of June 30, 2026. These lease obligations were approximately $278.99 billion, consisting of data centers, colocations, and certain network infrastructure, which will commence during the remainder of 2026 through 2036 with lease terms ranging from greater than one year to 30 years. In July 2026, we entered into additional data center leases with lease obligations of approximately $68 billion, which are expected to commence in 2027 and 2028, with lease terms of 18 to 20 years.
Scope and limits: Undiscounted future lease obligations not yet on the balance sheet, as of 30 June 2026; not a present value and not debt. The July 2026 leases (~$68bn) are a subsequent disclosure. One company's disclosure, not sector-wide.
Retrieved Oct 21, 2026.
Meta Platforms, Inc. (SEC Form 10-Q, Q2 2026) · Jul 29, 2026
Open the sourceOur non-marketable equity method investments include an arrangement, entered into in October 2025, to co-develop a data center campus in Louisiana (the Venture), in which we hold a 20% membership interest. This Venture provides strategic optionality and flexibility, which we expect will enable us to effectively meet future infrastructure capacity needs as AI markets and technologies develop. The parties have committed to fund their respective pro rata share of approximately $27 billion in total estimated development costs. Our lease agreements with the Venture, which cover the right to use properties on the data center campus, will commence in 2029 and have an aggregate initial lease commitment of approximately $12.31 billion. Each leased property has an initial four-year lease term and options to renew for a total lease period of up to 20 years. In addition, we have provided residual value guarantees (RVG) with an aggregate threshold of approximately $28 billion that decreases over time. […] RVG payments are not probable, and therefore no liability has been recorded to date. […] As of June 30, 2026 and December 31, 2025, the carrying value of our equity investment included within non-marketable equity investments on our condensed consolidated balance sheets was $2.92 billion and $1.83 billion, respectively, and our maximum exposure to loss related to the Venture was $46.03 billion and $45.95 billion, respectively, consisting of the carrying value of our equity investment, the lease commitments, our estimated future funding commitments, and the maximum RVG threshold. […] In July 2026, we entered into an exclusivity agreement to co-develop a data center campus in El Paso, Texas, through a venture in which we would hold a 20% membership interest. […] We will also provide residual value guarantees with a maximum aggregate exposure of approximately $13 billion.
Scope and limits: Maximum exposure to loss is a ceiling, not an expected loss; Meta states RVG payments are not probable and records no liability. The filing does not name the Venture's other investors or its lenders. The El Paso venture was not yet closed at filing.
Retrieved Oct 21, 2026.
Meta Platforms, Inc. (SEC Form 10-Q, Q2 2026) · Jul 29, 2026
Open the sourceCash, cash equivalents, and marketable securities were $90.26 billion as of June 30, 2026, an increase of $8.67 billion from December 31, 2025. The increase was due to $64.09 billion of cash generated from operations and $24.91 billion of net proceeds from the issuance of fixed-rate senior unsecured notes (the Notes) in May 2026. These increases were partially offset by $50.92 billion of capital expenditures, which includes purchases of property and equipment and principal payments on finance leases; $8.70 billion of taxes paid related to net share settlement of employee restricted stock unit (RSU) awards; $2.70 billion of payments of dividends and dividend equivalents; and $2.29 billion of cash used in other financing activities. […] Cash used in investing activities during the six months ended June 30, 2026 mostly consisted of $49.11 billion of purchases of property and equipment as we continued to invest in servers, data centers, and network infrastructure […] CONDENSED CONSOLIDATED BALANCE SHEETS (In millions, except number of shares and par value) (Unaudited) June 30, 2026 December 31, 2025 […] Long-term debt 83,664 58,744
Scope and limits: Six months to 30 June 2026. Balance-sheet row is in millions with columns June 30, 2026 then December 31, 2025; it is carrying value, not face value ($84.00bn principal outstanding per the same filing). Capex here includes finance-lease principal ($50.92bn); purchases of property and equipment alone were $49.11bn.
Retrieved Oct 21, 2026.
Alphabet Inc. (SEC Form 10-Q, Q2 2026) · Jul 23, 2026
Open the sourceDuring the six months ended June 30, 2025 and 2026, we spent $39.6 billion and $80.6 billion on capital expenditures, respectively. […] As of June 30, 2026, we have entered into leases, primarily related to data centers, that have not yet commenced with future lease payments of $85.2 billion. These leases will commence between 2026 and 2031 with non-cancelable lease terms between one and 26 years. […] As of June 30, 2026, we had long-term debt outstanding with a total carrying value of $98.2 billion. During the six months ended June 30, 2026, we issued $20.0 billion of U.S. dollar-denominated fixed-rate senior unsecured notes and $31.8 billion of foreign currency-denominated fixed-rate senior unsecured notes for general corporate purposes, across Sterling, Swiss Franc, Euro, Canadian dollars, and Japanese yen. […] The following table presents cash flows (in millions): Six Months Ended June 30, 2025 2026 Net cash provided by operating activities $ 63,897 $ 84,859 […] CONSOLIDATED BALANCE SHEETS (in millions, except per share amounts) As of December 31, 2025 As of June 30, 2026 […] Long-term debt 46,547 98,165 […] As of June 30, 2026, we had $519.5 billion of remaining performance obligations (“revenue backlog”), of which $513.9 billion related to Google Cloud.
Scope and limits: Six months to 30 June 2026. Table rows are in millions; the cash-flow columns are 2025 then 2026 and the balance-sheet columns December 31, 2025 then June 30, 2026. Long-term debt is carrying value, not face value. Leases not yet commenced are undiscounted future payments. Excludes the $25bn of notes issued in August 2026.
Retrieved Oct 21, 2026.
Alphabet Inc. (SEC Form 10-Q, Q2 2026) · Jul 23, 2026
Open the sourceOn June 4, 2026, the company completed an underwritten public offering of 29 million Class A shares at a price of $355.1982 per share and 29 million Class C shares at a price of $351.8018 per share. The net proceeds received by the company were $20.5 billion which will be used for general corporate purposes, including capital expenditures to scale AI infrastructure and global compute. Concurrently on June 4, 2026, the company completed a $10.0 billion private placement of 14 million Class A and 14 million Class C shares to an affiliate of Berkshire Hathaway Inc. […] On June 5, 2026, the company issued an aggregate amount of 385 million Series A and Series B depositary shares, representing 19 million shares of 6.25% mandatory convertible preferred stock, split evenly into Series A (indexed to Class A stock) and Series B (indexed to Class C stock). Aggregate net proceeds were $19.0 billion which will be used for general corporate purposes, including capital expenditures to scale AI infrastructure and global compute.
Scope and limits: Proceeds as reported (offering net proceeds; private placement stated gross). Use of proceeds is stated as general corporate purposes including AI infrastructure capex, not a dedicated allocation. One company's disclosure.
Retrieved Oct 21, 2026.
Alphabet Inc. (SEC Form 10-Q, Q2 2026) · Jul 23, 2026
Open the sourceAs of June 30, 2026, we had material purchase commitments and other contractual obligations totaling $811.0 billion, of which $200.7 billion was short-term. […] As of June 30, 2026, we provided backstops in the form of financial guarantees and credit derivatives with maximum potential amount of future payments of $7.6 billion and $43.8 billion, respectively. Upon a default under these backstops, we retain the right to assume the underlying leases for internal use or to sublease to third parties. Under specific conditions or following a predetermined period, we may elect to extinguish the backstop obligation by making a termination payment. […] We have also entered into an agreement to provide an estimated $24.1 billion of future backstops to support the build-out of data center and energy supply infrastructure, subject to finalization of terms with data center providers. […] Additionally, as of June 30, 2026, we have $20.0 billion of future capital funding commitments with a private company contingent upon the achievement of specified operational and financial milestones through 2030, which is accounted for as an equity derivative. […] We have entered into agreements with certain third parties to backstop certain payment obligations relating to data centers, which we account for as credit derivatives. The notional amounts for these credit derivatives represent the maximum potential exposure regarding future payments in the event of specified default scenarios by underlying parties. […] The gross notional amounts of outstanding derivative instruments were as follows (in millions): As of December 31, 2025 As of June 30, 2026 […] Credit derivatives $ 16,940 $ 43,785
Scope and limits: Notional amounts are maximum potential exposure under specified default scenarios, not expected losses; the filing does not name the data-centre counterparties or the private company. The $24.1bn of future backstops is an estimate subject to finalization of terms.
Retrieved Oct 21, 2026.
Amazon.com, Inc. (SEC Form 10-Q, Q2 2026) · Jul 30, 2026
Open the sourceCash provided by (used in) operating activities was $32.5 billion and $45.4 billion for Q2 2025 and Q2 2026, and $49.5 billion and $71.4 billion for the six months ended June 30, 2025 and 2026. […] Cash capital expenditures were $31.4 billion and $53.1 billion during Q2 2025 and Q2 2026, and $55.6 billion and $96.3 billion for the six months ended June 30, 2025 and 2026, which primarily reflect investments in technology infrastructure (the majority of which is to support AWS business growth) and in additional capacity to support our fulfillment network, both of which we expect to increase in 2026. […] We invested $28.7 billion in OpenAI’s Series C Preferred Stock for the six months ended June 30, 2026, including $13.7 billion invested in Q2 2026. Subsequent to June 30, 2026, we funded […] the remaining Commitment Amount of $21.3 billion. In Q2 2026, we also invested $10.0 billion in Anthropic nonvoting preferred stock. […] Cash inflows from financing activities resulted from proceeds from short-term debt, and other and long-term debt of $2.1 billion and $22.9 billion for Q2 2025 and Q2 2026, and $4.7 billion and $82.4 billion for the six months ended June 30, 2025 and 2026. We expect to undertake additional financing activities in 2026.
Scope and limits: Six months to 30 June 2026. Cash capital expenditures are net of proceeds from sales and incentives (gross purchases of property and equipment were $98.4bn per the cash-flow statement). Debt proceeds include short-term debt and other. Investments in AI companies are as reported, not marked to value.
Retrieved Oct 21, 2026.
Amazon.com, Inc. (SEC Form 10-Q, Q2 2026) · Jul 30, 2026
Open the sourceThe following summarizes our principal contractual commitments, excluding open orders for purchases that support normal operations and are generally cancellable, as of June 30, 2026 (in millions): […] Six Months Ended December 31, Year Ended December 31, 2026 2027 2028 2029 2030 Thereafter Total Long-term debt principal and interest […] Leases not yet commenced 4,018 11,732 9,278 9,483 9,227 93,476 137,214 […] As of June 30, 2026, we had $132.1 billion of unsecured senior notes outstanding (the “Notes”), including foreign currency-denominated Notes issued for general corporate purposes, the carrying values of which are subject to foreign exchange rate fluctuations. […] BALANCE SHEETS (in millions, except per share data) December 31, 2025 June 30, 2026 […] Long-term debt 65,648 128,894
Scope and limits: Table rows in millions. The commitments row gives undiscounted payments by year (2026 is six months; last column is the total). Balance-sheet columns are December 31, 2025 then June 30, 2026; long-term debt is the non-current carrying value and excludes the current portion. Excludes the £4.25bn of notes issued in September 2026.
Retrieved Oct 21, 2026.
Microsoft Corporation (SEC Form 10-K, fiscal year ended 30 June 2026) · Jul 29, 2026
Open the sourceCash from operations increased $46.8 billion to $182.9 billion for fiscal year 2026, primarily due to an increase in cash received from customers and a decrease in cash used to pay income taxes, offset in part by an increase in cash paid to suppliers. Cash used in financing increased $847 million to $52.5 billion for fiscal year 2026, primarily due to a $6.0 billion decrease in cash used for repayments of debt, offset in part by a $3.9 billion increase in common stock repurchases and a $2.4 billion increase in dividends paid. Cash used in investing increased $66.9 billion to $139.5 billion for fiscal year 2026, primarily due to a $51.4 billion increase in additions to property and equipment […] CASH FLOWS STATEMENTS (In millions) Year Ended June 30, 2026 2025 2024 […] Net cash from operations 182,935 136,162 118,548 Financing Proceeds from issuance (repayments) of debt, maturities of 90 days or less, net 0 (5,746 ) 5,250 Proceeds from issuance of debt 0 0 24,395 […] Additions to property and equipment (115,948 ) (64,551 ) (44,477 ) […] Current portion of long-term debt (9,227 ) (2,999 ) Long-term debt $ 31,067 $ 40,152 […] (In millions, except lease term and discount rate) June 30, 2026 2025 […] Total finance lease liabilities $ 66,594 $ 46,172 […] As of June 30, 2026, we had additional leases, primarily for datacenters, that had not yet commenced of $329.1 billion, with some arrangements subject to certain contractual conditions being met. These leases will commence between fiscal year 2027 and fiscal year 2033 with lease terms of 1 year to 20 years. […] Revenue allocated to remaining performance obligations, which includes unearned revenue and amounts expected to be invoiced and recognized as revenue in future periods, was $684 billion as of June 30, 2026.
Scope and limits: Fiscal year to 30 June 2026. Table rows in millions; cash-flow columns are fiscal 2026, 2025, 2024; lease and debt columns are June 30, 2026 then 2025. Leases not yet commenced are undiscounted and some are subject to contractual conditions. Long-term debt shown is the non-current carrying value.
Retrieved Oct 21, 2026.
Oracle Corporation (SEC Form 10-Q, Q1 fiscal 2027) · Sep 11, 2026
Open the sourceThe increase in cash, cash equivalents and marketable securities as of August 31, 2026 in comparison to May 31, 2026 was primarily due to $23.1 billion of cash inflows from our operations, which includes $11.4 billion of customer prepayments with a significant financing component; and $19.9 billion of cash proceeds from the issuance of common stock via the ATM Program, net of issuance costs, partially offset by $28.5 billion of cash used for capital expenditures; $3.1 billion of cash used for scheduled repayments of debt; $2.6 billion of restricted cash that was reclassed to prepaid expenses and other current assets; $1.6 billion of cash used to pay dividends to our common and preferred stockholders; $1.1 billion of cash used for repayment of commercial paper; $830 million of cash outflows for short-term financing related to capital expenditures, net; and $242 million of cash outflows for other financing activities, net, in each case during the first quarter of fiscal 2027. […] (in millions, except per share data) August 31, 2026 May 31, 2026 […] Notes payable and other borrowings, current $ 7,625 $ 7,199 […] Notes payable and other borrowings, non-current 117,712 122,342 […] As of August 31, 2026, we had $288 billion of additional lease commitments, substantially all related to data center arrangements, that are generally expected to commence between the second quarter of fiscal 2027 and fiscal 2029 and for terms of fifteen to nineteen years that were not reflected on our condensed consolidated balance sheets as of August 31, 2026 or in the maturities table above. […] Remaining performance obligations were $664 billion and $455 billion as of August 31, 2026 and 2025, respectively.
Scope and limits: Quarter to 31 Aug 2026. Balance-sheet rows in millions with columns August 31, 2026 then May 31, 2026; total borrowings ($125.3bn) is a derived sum of the two rows and is carrying value, not face value. Lease commitments are undiscounted and not on the balance sheet.
Retrieved Oct 21, 2026.
CoreWeave, Inc. (SEC Form 10-Q, Q2 2026) · Aug 11, 2026
Open the sourceThe total debt obligations are as follows (dollars in millions): Maturities Effective Interest Rates June 30, 2026 December 31, 2025 […] Total recourse debt, net of unamortized discount and issuance costs 31,405 20,726 […] Total non-recourse debt, net of unamortized discount and issuance costs $ 3,663 $ 647 […] Three Months Ended June 30, Six Months Ended June 30, 2026 2025 2026 2025 Revenue $ 2,575 $ 1,212 $ 4,653 $ 2,194 […] Interest expense, net (640) (267) (1,176) (531) […] Interest expense, net for the three months ended June 30, 2026 increased by $373 million, or 140%, compared to the three months ended June 30, 2025. Interest expense, net for the six months ended June 30, 2026 increased by $645 million, or 121%, compared to the six months ended June 30, 2025. These increases were primarily attributable to increased borrowing levels and total debt obligations.
Scope and limits: Rows in millions. Debt columns are June 30, 2026 then December 31, 2025, net of unamortized discount and issuance costs; total debt (~$35.1bn) is a derived sum of the recourse and non-recourse totals (the brief's XBRL carrying amount was $35.55bn). Excludes financing added after 30 June.
Retrieved Oct 21, 2026.
CoreWeave, Inc. (SEC Form 10-Q, Q2 2026) · Aug 11, 2026
Open the sourceThe following customers accounted for 10% or more of the Company's revenue for the periods presented: Three Months Ended June 30, Six Months Ended June 30, 2026 2025 2026 2025 Customer A 36% 71% 40% 72% Customer B 26% * 23% * Customer C 10% * * * Customer D * * * * * Customer did not represent 10% or more of revenue. The customer references of A through D may represent different customers than those reported in a previous period. Customers A and B accounted for 32% and 32%, of accounts receivable, net, respectively, as of June 30, 2026. […] As of June 30, 2026, the Company had $103.7 billion of unsatisfied RPO, of which 41% was expected to be recognized over the initial 24 months ending June 30, 2028, 39% between months 25 and 48, and the remaining balance recognized between months 49 and 78.
Scope and limits: The filing labels customers A to D only and says the labels may change between periods; it does not name them, so no mapping to companies is made. RPO is contracted, not yet recognized revenue and depends on delivery.
Retrieved Oct 21, 2026.
CoreWeave, Inc. (SEC Form 10-Q, Q2 2026) · Aug 11, 2026
Open the sourceWe fund these capital investments through a mix of debt and equity securities issuances, delayed draw term loan facilities, OEM financing arrangements, and cash from our balance sheet. […] As of June 30, 2026, we had $13.6 billion outstanding under our delayed draw term loan facilities. These delayed draw term loan facilities are collateralized with the assets underlying the contributed contracts and the pledged contractual cash flows, generally from investment grade counterparties. […] As of June 30, 2026, we had $16.6 billion aggregate outstanding principal amount of Notes composed of the following: […] As of June 30, 2026, the Company executed additional lease agreements, primarily for data centers, equipment, and office buildings, that had not yet commenced. The aggregate amount of estimated future undiscounted lease payments associated with such leases is $35.5 billion. These leases will commence between 2026 and 2029 with estimated lease terms of seven to sixteen years.
Scope and limits: "Generally from investment grade counterparties" is the company's own characterization; counterparties are not named. Outstanding principal amounts differ from net carrying values. Lease figure is undiscounted and excludes arrangements the company describes as uncertain.
Retrieved Oct 21, 2026.
CoreWeave, Inc. (SEC Form 8-K, 7 Aug 2026 event) · Aug 10, 2026
Open the sourceOn August 7, 2026, CoreWeave Financing DDTL V-V, LLC (the “Borrower”), a Delaware limited liability company and an indirect subsidiary of CoreWeave, Inc., a Delaware corporation (the “Parent”), entered into a credit agreement (the “Credit Agreement”) with, inter alios, JPMorgan Chase Bank, N.A., as administrative agent, U.S. Bank Trust Company, National Association, as collateral agent, U.S. Bank National Association, as depositary bank, JPMorgan Chase Bank, N.A. and MUFG Bank, Ltd. as joint lead arrangers, joint bookrunners and syndication agents, and the lenders party thereto, providing for a $2.6 billion delayed draw term loan facility (the “DDTL 5.5 Facility”). The DDTL 5.5 Facility was entered into primarily to finance capital expenditures required to perform certain customer contracts, including the acquisition of GPU servers and related infrastructure. […] The maturity date of the DDTL 5.5 Facility is September 1, 2031. […] Amounts borrowed under the DDTL 5.5 Facility are subject to an interest rate per annum equal to (i) for SOFR loans, Term SOFR (subject to a 0.00% floor) plus an applicable margin of 5.50% per annum […] All obligations under the DDTL 5.5 Facility are unconditionally guaranteed by the Parent pursuant to a parent guarantee and pledge agreement […] All obligations under the DDTL 5.5 Facility are secured by substantially all assets of the Borrower and its subsidiaries and a pledge of 100% of the equity interests in the Borrower held by CW Financing DDTL V-V Holdco, LLC.
Scope and limits: Facility size is a commitment, not drawn debt (the Q2 10-Q reports $1.2bn drawn after closing). The 8-K does not name the customer contracts being financed.
Retrieved Oct 21, 2026.
CoreWeave, Inc. (SEC Form 8-K, 17 Sep 2026 event) · Sep 22, 2026
Open the sourceOn September 22, 2026, CoreWeave, Inc. (“CoreWeave”) completed its previously announced upsized private offering of $4.2 billion aggregate principal amount of its 2.875% Convertible Senior Notes due 2033 (the “Notes”) to persons reasonably believed to be qualified institutional buyers pursuant to Rule 144A under the Securities Act of 1933, as amended (the “Securities Act”), including $500 million aggregate principal amount of Notes pursuant to the exercise in full of the initial purchasers’ option to purchase additional Notes. […] The Notes are general senior, unsecured obligations of CoreWeave. […] The Notes bear interest at a rate of 2.875% per year, payable semiannually in arrears on April 1 and October 1 of each year, beginning on April 1 ,2027. The Notes will mature on April 1, 2033 (the “maturity date”), unless earlier converted, redeemed or repurchased.
Scope and limits: Principal amount at issuance; conversion terms mean the notes may settle partly in shares. Does not show use of proceeds or any capped-call cost.
Retrieved Oct 21, 2026.
Alphabet Inc. (SEC Form 8-K, 10 Aug 2026) · Aug 10, 2026
Open the sourceOn August 10, 2026, Alphabet Inc. (“Alphabet”) closed its underwritten public offering of $25 billion aggregate principal amount of U.S. dollar-denominated senior notes (the “Notes”) pursuant to Alphabet’s registration statement on Form S-3 (File No. 333-296395). The Notes were issued pursuant to an Indenture (the “Indenture”), dated as of February 12, 2016, between Alphabet and The Bank of New York Mellon Trust Company, N.A., as trustee. The Notes consist of $750,000,000 aggregate principal amount of floating rate notes due 2028, $1,250,000,000 aggregate principal amount of 4.500% notes due 2028, $500,000,000 aggregate principal amount of floating rate notes due 2029, $2,000,000,000 aggregate principal amount of 4.625% notes due 2029, $3,500,000,000 aggregate principal amount of 4.875% notes due 2031, $2,500,000,000 aggregate principal amount of 5.200% notes due 2033, $4,500,000,000 aggregate principal amount of 5.450% notes due 2036, $3,000,000,000 aggregate principal amount of 6.250% notes due 2046, $4,500,000,000 aggregate principal amount of 6.375% notes due 2056 and $2,500,000,000 aggregate principal amount of 6.500% notes due 2066.
Scope and limits: Aggregate principal at issuance; does not state use of proceeds or show Alphabet's total debt after the issue.
Retrieved Oct 21, 2026.
Amazon.com, Inc. (SEC Form 8-K, 14 Sep 2026) · Sep 14, 2026
Open the sourceOn September 14, 2026, Amazon.com, Inc. (the “Company”) closed the sale of £1,250,000,000 aggregate principal amount of its 5.200% notes due 2029 (the “2029 Notes”), £1,000,000,000 aggregate principal amount of its 5.550% notes due 2032 (the “2032 Notes”), £1,000,000,000 aggregate principal amount of its 6.250% notes due 2038 (the “2038 Notes”), and £1,000,000,000 aggregate principal amount of its 6.650% notes due 2045 (the “2045 Notes” and, together with the 2029 Notes, 2032 Notes, and 2038 Notes, the “Notes”) pursuant to an Underwriting Agreement dated September 9, 2026 (the “Underwriting Agreement”) among the Company and the several underwriters named therein. […] The aggregate public offering price of the Notes was £4.242 billion and the estimated net proceeds from the offering were approximately £4.235 billion, after deducting underwriting discounts from the public offering price and before deducting offering expenses payable by us.
Scope and limits: Sterling principal at issuance (£4.25bn face; £4.242bn offering price); no US dollar equivalent is stated, and the filing does not show Amazon's total debt after the issue.
Retrieved Oct 21, 2026.
International Monetary Fund (IMF Blog, Global Financial Stability Report October 2026) · Oct 13, 2026
Open the sourceReview of 14 such transactions since 2023 found about $300 billion in equity investments and $650 billion in debt, in exchange for $1.4 trillion in future revenue commitments. Hyperscalers are borrowing more; investors have been leveraging to invest in AI stocks.
Scope and limits: IMF review of 14 transactions since 2023, not all AI financing; the blog does not list the deals or define future revenue commitments. Publication date only (the URL path says 12 Oct; the page shows 13 Oct).
Retrieved Oct 21, 2026.
International Monetary Fund (IMF Blog, Global Financial Stability Report October 2026) · Oct 13, 2026
Open the sourceCircular financing arrangements involving equity and debt flows between AI firms could mean stress at key companies receiving investment would lower revenue forecasts and investment valuations, weakening the value of the accumulated debt in those deals.
Scope and limits: A risk-scenario statement, not an estimate of losses; it does not name the firms involved. Publication date only.
Retrieved Oct 21, 2026.
Board of Governors of the Federal Reserve System (Financial Stability Report, May 2026) · May 8, 2026
Open the sourceRespondents raised several risks related to AI, including equity valuations; that capital expenditures are increasingly funded by debt, creating leverage in the system; and that widespread adoption of AI may contribute to labor market weakness.
Scope and limits: Summarizes views of surveyed market contacts, not the Federal Reserve's own assessment, and gives no figures. The PDF typesets AI in small capitals (text layer reads "aI"); rendered here as AI. Publication date only.
Retrieved Oct 21, 2026.
Coverage scope: US-listed issuers financing AI data-centre capacity: hyperscalers Microsoft, Amazon, Alphabet, Meta and Oracle, and the neocloud CoreWeave. Covers capex against operating cash flow, on-balance-sheet debt and bond issuance (USD, EUR, GBP and other currencies), finance and operating leases including leases signed but not yet commenced, off-balance-sheet ventures, guarantees and backstops, secured delayed-draw loans and convertibles, equity raises, contracted backlog and customer concentration, plus official-sector views (IMF, Federal Reserve). Out of scope: when capacity becomes operational, which business models keep returns, chip supply and export controls, power-market pricing.
Update history
- Update 1 · Oct 21, 2026 · this page